3月(yue)24日(ri),中國(guo)電建(jian)集團中南勘(kan)測設計研究院(yuan)有(you)限公(gong)(gong)司就中國(guo)電建(jian)中南院(yuan)中廣核阿里(li)雪域高原“零(ling)碳”光(guang)儲熱(re)電示范(fan)項目50MW光(guang)熱(re)發電項目常規島(dao)、儲熱(re)島(dao)及供暖部分(fen)EPC總(zong)承包工程分(fen)散控制(zhi)系統(DCS)采購(gou)項目發布競價公(gong)(gong)告。
項目概況:
本(ben)工程新建50MW光熱(re)電(dian)站,項目任務為清潔能源供暖與發電(dian)。擬建廠址位(wei)于西藏自(zi)治區阿里(li)地區獅泉(quan)河(he)鎮南(nan)側約(yue)7km處(chu),距(ju)行署中心區約(yue)7.5km。項目計劃于2024年06月15日開工,2025年9月30日前(qian)建成與供暖相關的儲(chu)換(huan)熱(re)島(dao)、常規島(dao)部分(fen),并實(shi)現供暖,總(zong)工期565天。儲(chu)熱(re)島(dao)傳熱(re)儲(chu)熱(re)介質采用二元熔(rong)(rong)(rong)鹽(yan)(yan)(60%硝(xiao)酸鈉(na)與40%硝(xiao)酸鉀),共(gong)設置1組(zu)熔(rong)(rong)(rong)鹽(yan)(yan)儲(chu)罐,包括一(yi)個冷熔(rong)(rong)(rong)鹽(yan)(yan)罐和一(yi)個熱(re)熔(rong)(rong)(rong)鹽(yan)(yan)罐,總(zong)儲(chu)熱(re)容量約(yue)為2635.2MWh,儲(chu)熱(re)時長約(yue)16h。熔(rong)(rong)(rong)鹽(yan)(yan)的工作溫度為290℃~520℃。
本工(gong)程裝機為(wei)(wei)2套(tao)25MW高溫超高壓、直(zhi)接空冷、軸(zhou)向排汽(qi)、抽(chou)汽(qi)凝汽(qi)式(shi)汽(qi)輪發電機組,主蒸(zheng)汽(qi)壓力(li)為(wei)(wei)12.2MPa、溫度511℃。兩套(tao)汽(qi)輪發電機組可(ke)互為(wei)(wei)備用。供(gong)(gong)暖(nuan)期(qi)為(wei)(wei)每年的(de)9月28日至次年的(de)5月23日,共(gong)計238天,供(gong)(gong)暖(nuan)面積為(wei)(wei)150萬平方米。其余時間為(wei)(wei)非供(gong)(gong)暖(nuan)期(qi)。
本項目設(she)置(zhi)1#和(he)2#兩套蒸汽(qi)發(fa)生(sheng)(sheng)系(xi)統,1#蒸汽(qi)發(fa)生(sheng)(sheng)系(xi)統產生(sheng)(sheng)的(de)蒸汽(qi)通往廠內新建換熱(re)首站加(jia)熱(re)熱(re)網循環水(shui),熱(re)水(shui)泵(beng)往原換熱(re)首站進行換熱(re)供(gong)暖(nuan);2#蒸汽(qi)發(fa)生(sheng)(sheng)系(xi)統產生(sheng)(sheng)的(de)蒸汽(qi)通往兩臺25MW抽汽(qi)凝汽(qi)式汽(qi)輪機組發(fa)電(dian)或抽汽(qi)供(gong)暖(nuan)(備用)。
在1#蒸汽(qi)發生系(xi)(xi)統(tong)(tong)發生故障停機(ji)或者檢修停機(ji)的情(qing)況(kuang)下,2#蒸汽(qi)發生系(xi)(xi)統(tong)(tong)可作為(wei)備用熱(re)源,產生的蒸汽(qi)通過(guo)旁路經減溫減壓后(hou)通往廠內(nei)新(xin)建換(huan)(huan)(huan)熱(re)首(shou)站(zhan)(zhan)換(huan)(huan)(huan)熱(re)。新(xin)建換(huan)(huan)(huan)熱(re)首(shou)站(zhan)(zhan)通過(guo)汽(qi)水換(huan)(huan)(huan)熱(re)加熱(re)循(xun)環水,熱(re)網(wang)循(xun)環水溫度為(wei)130/70℃,采(cai)用閉式(shi)雙(shuang)管制系(xi)(xi)統(tong)(tong)。熱(re)網(wang)調節方式(shi)為(wei)“質、量(liang)共同(tong)調節”。新(xin)建一(yi)次熱(re)力管網(wang)接入(ru)原(yuan)換(huan)(huan)(huan)熱(re)首(shou)站(zhan)(zhan),與原(yuan)有一(yi)次管網(wang)接駁。原(yuan)換(huan)(huan)(huan)熱(re)首(shou)站(zhan)(zhan)保留(liu)作為(wei)中(zhong)繼泵站(zhan)(zhan),以(yi)及極端工況(kuang)下的備用熱(re)源點。
本工程擬建廠(chang)址位(wei)于西藏自治區(qu)(qu)阿(a)里地(di)區(qu)(qu)獅(shi)泉(quan)河鎮南側約7km處(chu)(chu),距行(xing)(xing)署(shu)中心區(qu)(qu)約7.5km。獅(shi)泉(quan)河鎮地(di)處(chu)(chu)安獅(shi)公路和(he)新藏公路的交匯(hui)處(chu)(chu),位(wei)于噶爾縣(xian)(xian)(xian)最北(bei)側,北(bei)靠阿(a)里日土縣(xian)(xian)(xian),南倚昆莎鄉(xiang),西臨扎西崗鄉(xiang),東接左左鄉(xiang),是阿(a)里地(di)區(qu)(qu)行(xing)(xing)署(shu)與噶爾縣(xian)(xian)(xian)政(zheng)府所在地(di),對外交通便(bian)利。
采購范圍:
本次采購范圍為中廣核阿(a)里雪(xue)域(yu)高(gao)原(yuan)“零(ling)碳”光儲熱電(dian)示范項目50MW太陽能(neng)熱發(fa)電(dian)與供暖工程常規島(dao)、儲熱島(dao)及供暖部(bu)分EPC總承包(bao)工程分散控制系(xi)統(DCS)相(xiang)關工作,包(bao)含但不(bu)限(xian)于:
報價人提供(gong)本項(xiang)目(mu)分散控制系統(DCS)全部設計、設備和材料的(de)(de)采購、制造(zao)、檢驗和出廠前(qian)測(ce)(ce)試、清洗、標記、打包、裝(zhuang)運(yun)保護、運(yun)輸至現場(chang)、車(che)板交貨、檢測(ce)(ce)監督、試運(yun)行測(ce)(ce)試監督、性(xing)能測(ce)(ce)試監督、售后咨詢服務、現場(chang)技術支持(chi)、安裝(zhuang)及調(diao)試指導(dao)等,并提供(gong)包括安裝(zhuang)和試運(yun)行需(xu)要的(de)(de)全部的(de)(de)輔助設備和專用(yong)工具。
主要供貨范圍如下:
DCS系統(tong)供(gong)貨清單(報價人補充(chong)完整)
網絡安(an)全供貨清單:(報價方補充完整)
按照《信息安全(quan)技(ji)術網絡安全(quan)等(deng)(deng)級(ji)防護基本要(yao)求(qiu)》GB/T 22239-2019中第二級(ji)安全(quan)要(yao)求(qiu)提供完整的防護方(fang)案,詳細配置見(jian)下(xia)表。并(bing)提供測評認證服(fu)務,確保項目通過等(deng)(deng)保二級(ji)測評。
公告原文如下: